FAT, SAT and NDT: The Tests That Catch Problems Before They Reach Site

A defect found in the factory costs a repair. The same defect found on site can cost a delay.

The idea in plain English

A factory acceptance test (FAT) is carried out at the supplier’s plant before equipment ships. A site acceptance test (SAT) follows installation. Non-destructive testing (NDT), such as radiography or ultrasonic checks, tests welds without cutting them. Mill certificates document the steel’s properties.

How it works in practice

FAT checks functions, dimensions and performance against the specification, often with the client or a third-party inspector present. SAT repeats key tests after installation. NDT inspects welds and materials using methods such as radiography and ultrasonic testing, and results are recorded in inspection reports.

Why it matters: Skipping or rushing tests moves defects to site, where fixing them costs far more.

What to do with this

  1. Agree the inspection and test plan in the contract, including hold points and who witnesses them.
  2. Book third-party inspection early, since inspectors’ availability can affect delivery dates.
  3. Keep all certificates and test records organised for handover.

Where it goes wrong

Waiving factory tests to save time, then discovering faults after shipment, is an expensive shortcut.