When does a project actually finish? The answer matters because several things happen at that moment: the owner takes over, final payments move, and the contractor’s responsibilities change. Contracts mark this moment with practical completion.
Practical completion
Practical completion, called taking-over in FIDIC contracts, means the work is finished enough to be used for its intended purpose, even if small items remain. The owner or its engineer inspects the work and, if satisfied, issues a certificate.
On plants and factories, this usually follows testing. The contractor must show that the facility meets the agreed performance targets before the certificate is issued.
What changes at practical completion
- The owner takes possession and responsibility for the works.
- Delay damages stop running.
- The contractor’s insurance and care obligations change.
- Part of the retention is often released.
The defects liability period
After practical completion, there is a period when the contractor must come back and fix defects that appear. It is called the defects liability period, or the defects notification period in FIDIC contracts. It commonly lasts one or two years, depending on the contract.
During this period the owner lists defects, and the contractor repairs them at its own cost. If the contractor does not, the owner can hire someone else and recover the cost, often from retention or a bond.
Final completion
At the end of the period, once defects are fixed, a final certificate or performance certificate is issued. The remaining retention is released and the contractor’s main obligations end.
What the contractor must hand over
Handover usually includes more than the physical works: drawings of what was actually built, operation and maintenance manuals, test results, warranties and training for the owner’s staff. Missing documents are a common reason for delayed certificates.
Key takeaways
- Practical completion marks when the works are usable, not perfect.
- It switches off delay damages and transfers care of the works.
- The defects period keeps the contractor responsible for fixes.
- Documents are part of the handover.
Related explainers
- Performance Bonds, Advance Payment Guarantees and Retention: How Owners Protect Their Money
- Resolving Construction Disputes: Negotiation, Adjudication and Arbitration
This explainer is general information for learning. It is not legal, tax or financial advice. Rely on the actual contract, law or lender documents for any decision.