Two contractors bid for the same job and the prices differ by thirty percent. Neither is necessarily wrong. They priced different assumptions.
The idea in plain English
A bid price is built from layers: direct costs such as labour, materials, equipment and subcontractors; site overheads; head office overheads; a contingency for risk; and a profit margin. Each layer should be visible in your estimate.
How it works in practice
Take an illustrative job with $800,000 of direct cost. Add $80,000 for site overheads and $60,000 for a share of head office costs, which brings the total to $940,000. A 5 percent contingency adds $47,000, giving $987,000. A 10 percent margin on that adds $98,700, so the bid comes to roughly $1,085,700. The percentages change with the risk of the job, the payment terms and the competition.
What to do with this
- Build every bid from a written breakdown of direct cost, overheads, contingency and margin, and keep it for review after the job.
- Price risk explicitly. Add contingency for unclear scope, long payment terms, currency exposure and price movements in materials.
- Compare your actual costs with each estimate after completion, so your next bid is based on evidence.
Where it goes wrong
Cutting the margin to win, then discovering the job has no room for a single delay, is the classic error. A bid that wins at cost leaves no protection against the first problem.