H

THE PROJECT HERALD
The Intelligence Ledger of
Projects, Capital, Companies and Policy

How a Gas Pipeline Gets Built: From Route Study to First Gas

A pipeline looks simple from the outside: steel pipe in a trench. In reality, most of the work, and most of the delay, happens before the first joint is laid.

The idea in plain English

A typical sequence is feasibility and route study, environmental and social assessment, land and permits, financing and FID, ordering pipe and materials, construction, pressure testing, commissioning and first gas.

How it works in practice

After feasibility and route selection, the owner commissions an environmental and social study, negotiates land access and secures permits. Financing and FID follow. Line pipe and valves are ordered, often with long lead times. Crews clear the route, string pipe, weld and inspect each joint, coat the field joints, lower the pipe into the trench and backfill. The line is then pressure tested, dried and commissioned.

Why it matters: Knowing the stages lets you judge how far a project has really progressed, and where contracts will be placed next.

What to do with this

  1. Identify which stage the project is in, and target the contracts that come next: pipe and coating at procurement, welding and inspection at construction, testing equipment at commissioning.
  2. Track land and permit milestones. They are the leading indicator of delay.
  3. Plan for the sequence. Many late-stage packages, such as stations and metering, are awarded after the main pipeline contract.

Where it goes wrong

Progress percentages can mislead. A pipeline can be reported as mostly complete while stations, tie-ins and customer connections remain unfinished, and those are what determine when gas can actually be sold.

More from The Project Herald

Browse the Knowledge Library, track early-stage projects in Genesis, or find verified partners on the Partnership Board.