Captive and Embedded Power: Building Your Own Supply When the Grid Falls Short

For many factories and mines, reliable electricity means building it on site. The question is whether to keep it private or sell the surplus.

The idea in plain English

A captive plant is built to serve its owner’s own site, such as a factory or mine. An embedded plant connects to the local distribution network and sells to nearby customers.

How it works in practice

A captive plant usually runs on gas, diesel or solar with batteries and serves one facility. An embedded plant supplies customers on the local distribution network, which means it needs a licence, a connection agreement and a tariff approved by the regulator. Some projects combine both.

Why it matters: Both reduce reliance on weak grids. Nigeria’s Electricity Act 2023 allows states to regulate electricity within their borders, which widens room for such projects.

What to do with this

  1. Compare the cost per kilowatt-hour of captive supply against grid and diesel costs, including fuel supply risk and maintenance.
  2. Check licensing thresholds, since larger plants usually need a regulator’s permit even for private use.
  3. Secure a long-term fuel arrangement before committing to a gas-fired captive plant.

Where it goes wrong

Sizing for peak demand rather than average load leaves expensive capacity idle, and underestimating growth forces costly upgrades later.