Adding generating capacity to a grid that cannot carry it is like adding water to a pipe that is already full.
The idea in plain English
Transmission carries bulk power at high voltage from power stations over long distances to substations. Distribution steps the voltage down and delivers it to homes and businesses. They are often run by different companies. In Nigeria, the Transmission Company of Nigeria handles transmission, and distribution companies supply customers.
How it works in practice
Transmission lines and substations move large volumes of power across regions. Distribution networks reach end users and are where losses, metering gaps and billing problems often arise. Investment in each is separate and often managed by different organisations.
What to do with this
- When evaluating a generation project, check whether the transmission line and substation to take its output are funded and scheduled.
- Look for work in grid reinforcement, metering and network rehabilitation, where demand often follows generation additions.
- Ask about collection efficiency in the distribution area you plan to serve, since it shapes payment risk.
Where it goes wrong
Assuming that generation capacity can all be used is the common mistake. Unless the network is upgraded, new plants may be forced to run below capacity.