A large project can take two or three years. During that time the price of cement, steel and fuel can move, and so can the exchange rate. If the contractor priced the job in January, those moves can wipe out its profit by December. Contracts handle this in different ways.
Fixed price
In a fixed price contract, the price does not change when costs change. The contractor carries the risk. This is the most common arrangement for lump sum EPC contracts and gives the owner certainty. To protect itself, a contractor will often include a margin for expected increases in its bid.
Price adjustment
Some contracts include a clause that adjusts the price when costs rise or fall. Cost adjustment is usually optional, which means it only applies if the contract includes it. Many public works contracts do not.
A common method uses a formula. A fixed part of the price does not change, and the rest is split into weighted parts for labour, equipment and materials. Each part moves with a published index, so if materials rise 25 per cent and make up half the price, the payment increases accordingly. The weightings and the choice of index decide who gains or loses.
The index problem
The formula is only as good as the index. Published indices often arrive late and may not reflect what contractors actually pay for a specific material. That is why many contractors track their own supplier prices.
Currency risk
If a contractor is paid in naira but buys imported equipment in dollars, a fall in the naira raises its costs. Contracts can deal with this by paying part of the price in foreign currency, by linking part of the payment to an exchange rate, or by leaving the risk with the contractor. Which one applies is a commercial decision made before signing.
What contractors can do
- Read whether the contract has a cost adjustment clause.
- Check which index, base date and weightings apply.
- Lock in prices with suppliers early.
- Consider hedging foreign currency needs, where it is available.
Key takeaways
- Fixed price puts cost and currency risk on the contractor.
- Adjustment formulas only apply if the contract includes them.
- The index and weightings decide the outcome.
- Currency risk needs its own plan.